Technical Selection技术选型Published 2026.11.16

Why Is 1.25× Not Enough for UPS Generator Sizing?

On a generator rated at 0.80 power factor, 1.25× performs only a kW-to-kVA conversion: 1.25 × 0.80 = 1.00, so the resulting genset rated active output equals the UPS kVA number (1000.000 kW here); whether that is enough depends on the input. At 1000 kVA, 0.90 output power factor, 0.94 efficiency and 15% recharge, input active power is 1101.064 kW, or 10.106% above 1000.000 kW.

Technical Selection技术选型Published 2026.11.16

Can A/B Busways Be Sized for Half Load?

A dual-corded rack may draw half its power from each path, but that does not make half current a busway rating. If either path must carry the full downstream load after a failure, every busway must be checked at that full load. In a 24-rack, 8 kW example, normal path current is 145.857 A; a 160 A busway reaches 182.321% after one path is lost.

Technical Selection场景化趋势Published 2026.10.26

How Much Fault Current Does a Battery Inverter Add?

A grid-following storage converter cannot be modelled as a transformer impedance: on the current-limit plateau it behaves as a controlled current source. Grid-forming units act as a voltage source in the first instants and are covered here only through a sensitivity multiplier. The share of transformer fault current is roughly k × u_k × S_pcs/S_tr: on a 1250 kVA transformer with u_k 6%, a 500 kVA grid-following unit at k = 1.5 pushes 30.07 kA to 31.15 kA, a 3.60% share of the transformer current, and a scalar sum used as an upper bound. Bolted three-phase fault, transformer impedance only, same-voltage nominal model.

Technical Selection技术选型Published 2026.10.26

Can You Just Add Up Parallel Cable Ampacity?

Two identical cables in parallel do not simply add up. Table B.52.17 of GB/T 16895.6-2014 counts circuits or multi-core cables, so a pair counts as 2 units, taking 0.85, and the ambient factor applies on top. For 240 mm² Cu/PVC, three loaded conductors, method C, cables touching, one circuit at 40 °C, the pair carries 596.0 A, not 806 A, which is 298.0 A per cable. The table holds only for equally loaded cables: at full load with a 10% length mismatch, the linked electro-thermal solution gives 309.7 A and 72.7 °C on the shorter cable. That is a model result, not a measurement.

Technical Selection标准政策Published 2026.10.19

Which edition governs a busway's type test?

The obtained text of the current busway standard GB/T 7251.6-2015 (its foreword, Chapter 1 and part of Chapter 10) cites the general rules with a year, landing on GB 7251.1-2013, which has been fully replaced; the "citation with a year (dated reference)" rule itself is inferred from those citations and the contents (Chapter 2's text was not obtained). The international side has the same shape: IEC 61439-6:2012 states that it is to be read in conjunction with the 2011 general rules, cancelled and replaced by the 2020 third edition. That answers a textual question — it does not rule on which edition any particular report must follow, which also turns on certification rules, change notices and contracts. The second edition is not yet published.